Fault Tree Analysis starts with a potential, or actual, undesirable event and works backwards seeking the immediate cause, preceding causes and combinations of causes. [Pg.159]

CONSTRUCTING THE FAULT TREE. Fault tree construction begins at the top event and proceeds, level by level, until all fault events have been traced to their basic contributing events or basic events. The analysis starts with a review of system requirements, function, design, environment, and other factors to determine the conditions, events, and failures that could contribute to an occurrence of the undesired top event. The top event is then defined in terms of sub-top events, i.e., events that describe the specific "whens and wheres" of the hazard in the top event. Next, the analysts examine the sub-top events and determine the immediate, necessary, and sufficient causes that result in each of these events. Normally, these are not basic causes, but are intermediate faults that require further development. For each intermediate fault, the causes are determined and shown on the fault tree with the appropriate logic gate. The analysts follow this process until all intermediate faults have... [Pg.62]

Fault Tree. When direct data allowing to calculate the probability of a failure mode are not available or this failure form is complex, it is proposed the elaboration of a fault tree. It is a method of multidisciplinar analysis that begins with the selection of a failure mode or event that is tried to avoid. The event is developed into its immediate causes, and the sequence of events continues until basic causes are identified. The fault tree is constructed showing the logical event relationships that are necessary to result in the top event. The fault tree reaches terminal events whose probability must be calculated or estimated. These events can be basic events, which do not require to be explained by means of other previous events, or events which are not developed because it is not considered necessary or for lack of information. [Pg.128]

FTA emphasizes the lower-level fault occurrences that directly or indirectly contribute to a major fault or undesired event. The technique is one of "reverse thinking" where the analyst begins with the final undesirable event that is to be avoided and identifies the immediate causes of that event [11]. By developing the lower-level failure mechanisms necessary to produce higher level occurrences, a total overview of the system is achieved. Once completed, the fault tree allows an engineer to fully evaluate a system safety or reliabihty by altering the various lower-level attributes of the tree. Through this type of analysis, a number of variables may be visualized in a cost-effective manner. [Pg.498]


See other pages where Fault tree analysis immediate cause is mentioned: [Pg.84]    [Pg.57]    [Pg.26]    [Pg.91]    [Pg.74]    [Pg.1432]    [Pg.99]   
See also in sourсe #XX -- [ Pg.332 ]




SEARCH



Fault Tree Analysis

Fault Tree Analysis analyses

Fault analyses

Fault tree

Tree analysis

© 2024 chempedia.info