Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Expander-compressor startup

The required suction pressure to the expander is not available until the oxidizer tower reaches design pressure. With two compressors in operation this takes approximately 15 min. Since the expander wheel is mounted on the compressor pinion, enough flow must be available at startup to prevent overheating. The calculated windage loss of the expander wheel (40 hp) requires about 16,000 Ib/lir of flow to prevent overheating. [Pg.456]

Startup flow to the expander is designed to be supplied from the discharge of the compressor through a throttle valve and cooler. A careful study of the characteristics of the compressor blow-off valve and the expander startup valve was performed by Solvay process engineers. Based on these calculations, the startup cooler and valve were sized to supply the minimum required flow to tlie expander wheel. [Pg.456]


See other pages where Expander-compressor startup is mentioned: [Pg.291]    [Pg.291]    [Pg.254]    [Pg.243]    [Pg.176]    [Pg.205]    [Pg.460]    [Pg.442]    [Pg.271]    [Pg.314]   
See also in sourсe #XX -- [ Pg.291 ]




SEARCH



Compressors startup

Expander-compressor

Startup

© 2024 chempedia.info