Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Dome Prestressing Description of Tendon Arrangement

There will be three layers of Tendons, are in each of the three directions. Each group of Tendons will take 1/1.5 times the required prestressing force. For check on this see roof plane on sheet 2. Red cross hatching indicates areas where 2 groups of tendons are anchored. Single red lines indicates where only one group of tendons are anchored. [Pg.393]

Each anchor zone is divided into 12 equal areas. A of these areas have one tendons group anchored where each group will take 1/12 of the prestressing force. Also V2 the anchor areas where 2 groups of tending area will take 1/6 of the prestressing force with each direction contributing 1/12. [Pg.393]

5 times required prestressing of force is furnished by all the tendons, therefore the computed prestress force will be divided 1.5 to act read prestress Assumption and Criteria for design. [Pg.394]


See other pages where Dome Prestressing Description of Tendon Arrangement is mentioned: [Pg.393]   


SEARCH



Dome tendon

Dome, doming

Domes

Prestressing

© 2024 chempedia.info