Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Concrete aggregate test procedures

Except for the CMUs which were produced in an industrial block plant, the batches were completed following the same procedure. Before starting a typical concrete batch, the water, sand and pea gravel were adjusted for moisture content. The two aggregates and the plastic filler were introduced into the mixer and mixed for approximately 30 seconds. The cement and two-thirds of the total water were added and the drum was rotated for 2 minutes more. The rest of the water was added within the next 30 seconds. After two minutes the drum was stopped, and the slump test was performed. The drum was then scraped to loosen any material not previously mixed. It was restarted and rotated... [Pg.44]


See other pages where Concrete aggregate test procedures is mentioned: [Pg.180]    [Pg.183]    [Pg.180]    [Pg.183]    [Pg.165]    [Pg.107]    [Pg.108]    [Pg.97]    [Pg.249]    [Pg.361]    [Pg.10]   
See also in sourсe #XX -- [ Pg.183 ]




SEARCH



Aggregate tests

Concrete aggregates

Testing procedures

© 2024 chempedia.info