Aggregate planning master production schedule

Capacity planning verifies the feasibility of the plans at both aggregate and detailed levels. At first stage, master production schedule feasibility can be verified in an aggregated way. After material planning is performed, capacity planning verification may induce adjustments in the detailed plans. Also, the master production schedule can be modified if capacity planning reveals feasibility problems. [Pg.1005]

The aggregate production plan is a proactive plan that effectively utilizes the organization s resources to satisfy demand as forecast. It determines not only the planned output levels but also the appropriate mix of resource inputs to be used. Inputs include inventory levels, back orders, subcontracting, and the available workforce. The outputs are a master production schedule, raw material usage. [Pg.38]

From an aggregate plan, a planner must disaggregate the available information and build a rough master production schedule (MPS) that identifies the batches produced in each period at the level of each product family. We return to the Red Tomato example to illustrate a simple approach to disaggregate an aggregate plan. Although this approach is not necessarily optimal, it is simple to implement and allows for a feasibility check. More sophisticated methods (e.g., see Bitran and Hax, 1981) are available if a planner wants to search for better solutions. These methods, however, are difficult to implement and may not be able to reflect all the complex realities. For this reason, we propose this simple approach. [Pg.224]

A simple definition that I have heard for aggregate planning is two- to 12-month capacity plarming. There are three components of this type of planning. The first is the business plan, which determines the strategy for capacity and production. The second is the production plan, which creates the production capacity utilization. The third is the master schedule, which establishes the production schedule for the specific products. [Pg.49]


See other pages where Aggregate planning master production schedule is mentioned: [Pg.11]    [Pg.999]    [Pg.1004]    [Pg.314]    [Pg.321]    [Pg.137]    [Pg.122]   
See also in sourсe #XX -- [ Pg.224 ]




SEARCH



Aggregate planning

Master production schedule

Master schedule

Product plan

Product planning

Production planning

Production schedule

Products aggregation

© 2024 chempedia.info