Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Waste heat boiler dust settling

The exhaust gases are generally discharged into dust and fume knockdown equipment to avoid contamination of the atmosphere. Gas-cleaning equipment includes cyclones, settling chambers, scrubbing towers, and electrical precipitators. Heat-recovery devices are utilized both within and outside the kiln. These result in an increase in kiln capacity or a decrease in fuel consumption. Waste-heat boilers, grates, coil systems, and chains are used for this purpose. [Pg.1028]

Fig.1.13. Koppers-Totzek coal gasificaticni process, (a) Dust bunker system (b) dust screw (c) gasifier (d) waste heat boiler (e) ash extractor (f) wash cooler (g) disintegrator (A) final cooler (i) gas blower (k) settling tank (1) cooling tower... Fig.1.13. Koppers-Totzek coal gasificaticni process, (a) Dust bunker system (b) dust screw (c) gasifier (d) waste heat boiler (e) ash extractor (f) wash cooler (g) disintegrator (A) final cooler (i) gas blower (k) settling tank (1) cooling tower...

See other pages where Waste heat boiler dust settling is mentioned: [Pg.33]    [Pg.1934]    [Pg.13]    [Pg.2182]    [Pg.33]    [Pg.33]    [Pg.109]    [Pg.272]    [Pg.33]    [Pg.290]   
See also in sourсe #XX -- [ Pg.34 ]

See also in sourсe #XX -- [ Pg.34 ]

See also in sourсe #XX -- [ Pg.34 ]




SEARCH



Boiler waste heat

Boilers waste heat boiler

SETTLE

Settling

© 2024 chempedia.info