Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Time consuming

The number and shape of the grid blocks in the model depend upon the objectives of the simulation. A 100 grid block model may be sufficient to confirm rate dependent processes described in the previous section, but a full field simulation to be used to optimise well locations and perforation intervals for a large field may contain up to 100,000 grid blocks. The larger the model, the more time consuming to build, and slower to run on the computer. [Pg.205]

The older steam drums, which can sustain these additional effects better, have to be removed of their position in the production line because of the bearing and this would be expensive and time consuming. [Pg.33]

It was pointed out, that the periodical inspection of the steam drums has been become an absolute must especially under the circumstance, that the economical pressure results in smaller wall thickness, higher steam pressure and higher rotation speed. The conventional periodical inspection (hydrotest and visual inside inspection) is on one hand time consuming and therefore expensive and on the other hand the results of the hydrotest are doubtful and can result in a seriously damage of the roundness and balance of the steam drum. [Pg.34]

Even the replacement of the hydrotest by a NDT method is only sufficient, if you perform much more than it is usual today e.g. a complete ET of the cylindrical part, which requires the possibility to rotate the drum during the shut down and is therefore much more time consuming and expensive. [Pg.34]

Eddy-current non-destructive evaluation is widely used in the aerospace and nuclear power industries for the detection and characterisation of defects in metal components. The ability to predict the probe response to various types of defect is highly valuable since it enables the influence of particular parameters to be studied without recourse to costly and time consuming experiments. The solution of forward problems is also essential in the process of inverting experimental data. [Pg.140]

More recently, the circular array was proposed to assess the reflectivity of cylindrical specimens [3]. First, a circular C-scan image was obtained. The total scan time was about 25 min., which does not include a relatively time consuming alignment of the specimen. From the circular C-scan image, circular B-scan profiles were chosen in specific planes. The transducer was a focused high frequency transducer with a center frequency of 25 MHz of the transducer bandwidth. This frequency corresponds to a wavelength of 0.11 mm and 0.25 mm in the Plexiglas specimen and the AlSi-alloy, respectively. Additional experimental parameters are presented in Table 1. [Pg.203]

The simulation of the actual distortion of the eddy current flow caused by a crack turns out to be too time consuming with present means. We therefore have developed a simple model for calculating the optimum excitation frequencies for cracks in different depths of arbitrary test sarriples Using Equ. (2.5), we are able to calculate the decrease in eddy current density with increasing depth in the conductor for a given excitation method, taking into account the dependence of the penetration depth c on coil geometry and excitation frequency. [Pg.257]

The LVQ network needs only 20000 but more time consuming training steps. Finally the following classification rates are received ... [Pg.465]

The method of volume rendering uses the whole sample volume for visualization. Therefor semitransparent representations of the samples inner structure are possible and the detection of small cracks or faults is much easier compared to the surfaces based techniques (Fig. 4 b). From its principle volume rendering is more time consuming compared to surface representation. [Pg.495]

The laser-based gun tube inspection systems are intended to augment and, perhaps eventually, replace the labor-intensive, time consuming and subjective visual inspection methods that are currently employed by these facilities. [Pg.1066]

In AFM, the relative approach of sample and tip is nonnally stopped after contact is reached. Flowever, the instrument may also be used as a nanoindenter, measuring the penetration deptli of the tip as it is pressed into the surface of the material under test. Infomiation such as the elastic modulus at a given point on the surface may be obtained in tliis way [114], altliough producing enough points to synthesize an elastic modulus image is very time consuming. [Pg.1700]

Calculating points on a set of PES, and fitting analytic functions to them is a time-consuming process, and must be done for each new system of interest. It is also an impossible task if more than a few (typically 4) degrees of freedom are involved, simply as a consequence of the exponential growth in number of ab initio data points needed to cover the coordinate space. [Pg.254]

The Hemian-Kluk method has been developed further [153-155], and used in a number of applications [156-159]. Despite the formal accuracy of the approach, it has difficulties, especially if chaotic regions of phase space are present. It also needs many trajectories to converge, and the initial integration is time consuming for large systems. Despite these problems, the frozen Gaussian approximation is the basis of the spawning method that has been applied to... [Pg.275]

This hierarchical extrapolation procedure can save a significant amount of computer time as it avoids a large fraction of the most time consuming step, namely the exact evaluation of long range interactions. Here, computational... [Pg.82]

The reaction center has either to be spedfied when inputting a reaction into a database, or it has to be determined automatically. Specification on input is time-consuming but it can benefit from the insight of the human expert, particularly so if the reaction input is done by the primary investigator as is the case in an electronic notebook. Automatic determination of reaction centers is difficult, particularly so when incomplete readion equations are given where the stoichiometry of a reaction is not balanced see Section 3.1). One approach is to try first to complete the stoichiometry of a reaction equation by filling in the missing molecules such as water, N2, etc. and then to start with reaction center determination. A few systems for automatic reaction center specification are available. However, little has been published on this matter and therefore it is not discussed in any detail here. [Pg.175]


See other pages where Time consuming is mentioned: [Pg.8]    [Pg.49]    [Pg.60]    [Pg.304]    [Pg.91]    [Pg.206]    [Pg.464]    [Pg.492]    [Pg.713]    [Pg.736]    [Pg.780]    [Pg.950]    [Pg.1032]    [Pg.1481]    [Pg.1642]    [Pg.1770]    [Pg.1775]    [Pg.1809]    [Pg.1828]    [Pg.2185]    [Pg.2256]    [Pg.2277]    [Pg.2589]    [Pg.2930]    [Pg.5]    [Pg.83]    [Pg.132]    [Pg.130]    [Pg.170]    [Pg.176]    [Pg.298]    [Pg.299]    [Pg.302]    [Pg.345]    [Pg.347]    [Pg.352]   
See also in sourсe #XX -- [ Pg.94 ]

See also in sourсe #XX -- [ Pg.160 ]

See also in sourсe #XX -- [ Pg.489 , Pg.511 , Pg.651 ]




SEARCH



Cross validation time-consuming

Data analysis time-consuming

© 2024 chempedia.info