Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Section 6.24 PFTR, Shaft Furnace

Installed unit including burden equipment, gas cleaning, blowers, conveyors, cowpers, cooling system, furnace gun but excluding bins and slag granulation, 38000000 at capacity of 30 kg/s iron with n = 0.63 for range 4.5-200 kg/s. [Pg.423]

Installed incinerator unit 5 500 000 at nominal hearth area 20 with n = 0.49 for the range 13.5-40 m.  [Pg.424]

Aerated lagoon including earthwork, embankment, concrete on embankment and apron excluding aeration. PM cost 1 360000 at volume = 10000 m with n = 0.72 for the range 380-760000 m.  [Pg.424]


See other pages where Section 6.24 PFTR, Shaft Furnace is mentioned: [Pg.423]    [Pg.423]   


SEARCH



Furnaces shaft

PFTR

Shaft

© 2024 chempedia.info