Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Load shedding High speed

However, it is also possible to introdnce a high-speed load shedding scheme into the power system when Fg is fonnd to be above 105%. Snch a scheme will compute in an anticipatory manner how much consumption should be deleted in the event of a loss of one generator. The designer will be able to predetermine enough low priority consumers to achieve the necessary corrective action. See Chapter 16. [Pg.14]

The PMS will receive this shut-down signal from one of the 86 lock-out relays, and will respond in exactly the same way as with the high-speed load shedding, see sub-section 16.3.1. [Pg.441]

The low-speed load shedding will be more active when the ambient temperature is high i.e. near to the site high limit. [Pg.441]


See other pages where Load shedding High speed is mentioned: [Pg.737]    [Pg.436]    [Pg.436]    [Pg.436]    [Pg.625]    [Pg.2639]    [Pg.78]    [Pg.996]    [Pg.60]    [Pg.33]   
See also in sourсe #XX -- [ Pg.436 ]




SEARCH



High-speed

Load shedding

Sheds

© 2024 chempedia.info