Big Chemical Encyclopedia

Chemical substances, components, reactions, process design ...

Articles Figures Tables About

Letdown service

Basic to establishing whether power recovery is even feasible, let alone economical, are considerations of the flowing-fluid capacity available, the differential pressure available for the power recovery, and corrosive or erosive properties of the fluid stream. A further important consideration in feasibihty and economics is the probable physical location, with respect to each other, of fluid source, power-production point, and final fluid destination. In general, the tendency has been to locate the power-recoveiy driver and its driven unit where dictated by the driven-unit requirement and pipe the power-recoveiy fluid to and away from the driver. While early installations were in noncorrosive, nonerosive services such as rich-hydrocarbon absorption oil, the trend has been to put units into mildly severe seiwices such as amine plants, hot-carbonate units, and hydrocracker letdown. [Pg.2524]

Second let-down cooler put in service to allow increased letdown. [Pg.147]


See other pages where Letdown service is mentioned: [Pg.81]    [Pg.419]    [Pg.133]   
See also in sourсe #XX -- [ Pg.5 ]




SEARCH



Letdown

© 2024 chempedia.info