Heat Exchanger Networks III - Capital and Total Cost Targets... [Pg.387]

Figure 7.9 The Xp parameter avoids steep slopes on the Fp curves, whereas minimum Fp does not. (Reprinted from Ahmad, Linnhoff, and Smith, Cost Optimum Heat Exchanger Networks II. Targets and Design for Detailed Capital Cost Models, Computers Chem, Engg., 7 751, 1990 with permission from Elsevier Science, Ltd.)... Figure 7.9 The Xp parameter avoids steep slopes on the Fp curves, whereas minimum Fp does not. (Reprinted from Ahmad, Linnhoff, and Smith, Cost Optimum Heat Exchanger Networks II. Targets and Design for Detailed Capital Cost Models, Computers Chem, Engg., 7 751, 1990 with permission from Elsevier Science, Ltd.)...
Calculate the capital cost target for the mixed specification heat exchanger network from Eq. (7.21) using the cost law coefficients for the reference specification. [Pg.230]

Hall, S. G., Ahmad, S., and Smith, R., Capital Cost Target for Heat Exchanger Networks Comprising Mixed Materials of Construction, Pressure Ratings and Exchanger Types, Computers Chem. Eng., 14 319, 1990. [Pg.237]

Ahmad S, Linnhoff B and Smith R (1990) Cost Optimum Heat Exchanger Networks II Targets and Design for Detailed Capital Cost Models, Comp Chem Eng, 7 751. [Pg.356]

R. D. Colberg and M. Morari. Area and capital cost targets for heat exchanger network synthesis with constrained matches and unequal heat transfer coefficients. Comp. Chem. Eng., 14 1,1990. [Pg.438]

Increasing the chosen value of process energy consumption also increases all temperature differences available for heat recovery and hence decreases the necessary heat exchanger surface area (see Fig. 6.6). The network area can be distributed over the targeted number of units or shells to obtain a capital cost using Eq. (7.21). This capital cost can be annualized as detailed in App. A. The annualized capital cost can be traded off against the annual utility cost as shown in Fig. 6.6. The total cost shows a minimum at the optimal energy consumption. [Pg.233]


See other pages where Heat exchanger network target capital cost targets is mentioned: [Pg.159]    [Pg.232]    [Pg.236]    [Pg.518]    [Pg.357]    [Pg.357]    [Pg.394]    [Pg.394]    [Pg.396]    [Pg.213]    [Pg.518]    [Pg.247]    [Pg.248]    [Pg.29]    [Pg.240]    [Pg.236]    [Pg.247]    [Pg.248]    [Pg.229]    [Pg.239]    [Pg.242]    [Pg.252]    [Pg.401]    [Pg.402]    [Pg.393]    [Pg.395]   
See also in sourсe #XX -- [ Pg.228 , Pg.229 , Pg.230 , Pg.231 , Pg.232 , Pg.447 , Pg.448 ]

See also in sourсe #XX -- [ Pg.393 , Pg.394 ]




SEARCH



Capital cost

Capital cost targets

Heat Exchanger Networks - Capital and Total Cost Targets

Heat exchanger network target

Heat exchanger networks

Heat exchangers costs

Heating cost

Heating target

Target cost

© 2024 chempedia.info