Figure 3-10 Conditions at the time of the failure of the coker drum. Figure 3-10 Conditions at the time of the failure of the coker drum.
The pre-op crew steamed out the B Unit first and vented it through the 8-inch steam vent piping. The failure occurred about four days later. An eyewitness in the operators shelter heard what sounded like a muffled explosion and ran out the backdoor to. see if he could locate fire or smoke. Fortunately, no fire could be seen, but the collapsed coker drum was very visible. [Pg.63]


See other pages where Coker drum, failure is mentioned: [Pg.915]   
See also in sourсe #XX -- [ Pg.61 , Pg.62 , Pg.63 ]